Hi,
When I add/update sysjobschedules, the Sql Server Agent updates the next_run_date and next_run_time fields, but there is a delay from when I've update that entire row. How can I have those two fields be calculated right after I have updated the row? Thanks

tkizer
Almighty SQL Goddess

38200 Posts

Posted - 2004-06-25 : 16:13:19
If you used sp_add_jobschedule like you should be, it would all be handled by it. If you look inside this stored procedure in the msdb database you'll notice it is using sp_sqlagent_notify to notify the SQLAgent of changes. I guess you could use it too. You should always use the system stored procedures to modify system tables if one exists.

Tara
Go to Top of Page

ckuo@kahluadesigns.com
Yak Posting Veteran

58 Posts

Posted - 2004-06-28 : 11:07:11
Thanks for the info. I have a trigger that adds/updates jobs and schedules using the system stored procedures. I did notice that at the end of the sp_add_jobschedule that it calls sp_sqlagent_notify so SQL Agent can calculate the next_run_date. The problem is, even though SQL Agent is notified, it does not calculate the next_run_date immediately. At the end of my Trigger, I need to calculate the next_run_date so that I can proceed with some other stuff. Is there code to manually calculate it myself? Or can I manually poll SQL Agent for the date? Thanks.
Go to Top of Page

ckuo@kahluadesigns.com
Yak Posting Veteran

58 Posts

Posted - 2004-06-30 : 11:34:47
Anybody know how I can speed up the time it takes SQLAgent to recalculate a job's next run date AFTER its has been notified of a change? It takes about 10 mins right now. Thanks